jimgreen
23-02-2008, 18:33
Right, engine is going in next weekend even if I haven't finished polishing it. I want to order all the pipe work I need before hand soooo....
1) Fuel lines ok with the MR2 ones?
2) the hard line that Paul puts in round the back of the bay, can I just use a normal hose? Or is routing an issue? I'm guessing it just goes from the filler cap to the expansion bottle.
3) The hoses for the heater, I see that paul just uses a new set of pipes. Which one on the MR2 is coming away from the heater, and how much hose do I need?
4) The Rad hoses, can these be bodged together?
Thanks guys!
1) Fuel lines ok with the MR2 ones?
2) the hard line that Paul puts in round the back of the bay, can I just use a normal hose? Or is routing an issue? I'm guessing it just goes from the filler cap to the expansion bottle.
3) The hoses for the heater, I see that paul just uses a new set of pipes. Which one on the MR2 is coming away from the heater, and how much hose do I need?
4) The Rad hoses, can these be bodged together?
Thanks guys!