Allez oop!
:mrgreen:
Under a CRX all day Monday, Grinder packed up yesterday and fought for 3 hours today to get the engine out the 205, then finally got some time on the 2.
Subframe is now done, just needs painting, along with rear torque mount. Heat shielding should be here 2moro so it'll be dropped out, sorted and then refitted for the last time.
Thinking about doing the subframe red too :mrgreen:
That would be a blue baboons arss as it is Scotland.
You're right there mate. With a 1MZ shaped rocket up it lol
More metal work today :)
made up the new rear exhaust manifold, forgot to get pictures of it but it's now pointing it's flange nicely where i want it and clearing the rear subframe.
Once that was all done i got cracking on the fitting of the backbox. Lots and lots of measuring, cable tie nudging and a little welding and it's all now in place ed zackery where i want it.
Once i've got hold of a couple of 2" flexis i can make up the separate downpoops and mate it up to the backbox. Little trimming of the valance and it's all there.
Nice :thumbsup:
still need to work out what I am doing for an exhaust.